Route Map

Almaty Region: Ili, Talgar districts

Implementation time

- Concession period : 20 years
- Construction : August 2020 ~ April 2023
- Operation : June 2023 ~ 2039

BAKAD

The project is a part of the “Western China – Western Europe” transcontinental transport corridor.

Technical Parameters:

- Length : - 66 km (6 lanes – 51.5 km, 4 lanes – 14.5 km)
- Road category: - 1-A (with a fee system)
- Permitted speed: - 120 km/h on all sections
- Number of cameras: - 223 units.
- Transport interchanges: - 7 units (5 – full clover type, 1 - roundabout, 1 - like "half clover")
- Bridges: 18 units
- Overpasses: 22 units
- Overhead pedestrian crossings: 3 units
- Culverts: 108 units
- Barrier fencing: 208 km
- Mesh fencing: 141 km
- Noise protection screens: 14.2 km

Currently, the average traffic intensity of vehicles along the BAKAD exceeds 50,000 vehicles per day, with more than 80% of those being passenger vehicles.

Conveniences and benefits of driving through BAKAD:

- Reduced travel time
- Comfortable and safe driving on high quality roads
- Reduction of atmospheric air emissions
- Reduction of congestion in Almaty and suburban areas
- Improved capacity and competitiveness of transit routes